BioGreenTech
BioGreenTech × QCVN 40:2025/BTNMT

Circular environmental solutions for Vietnamese factories

One partner for three value streams – WWTP operations · Water treatment chemicals · Hazardous waste recovery & recycling. Documentation matches reality, FDI audit-ready.

[120+]
B2B customers
[15+]
years experience
24/7
operations support
Image: overview of a WWTP operated by BioGreenTech

Compliance Standards

  • QCVN 40:2025/BTNMT
  • Decree 110/2026/ND-CP · EPR
  • RBA compliant
  • ZDHC ready
  • ZWTL – Zero Waste to Landfill
  • Business Reg. 3703240466

One partner — Three value streams

Services, chemicals and recycling from one engineering team — paperwork that matches real operations.

01

End-to-end WWTP services

From survey – design – construction – operation – maintenance. Engineers on-site, no outsourcing.

  • WWTP health check per QCVN 40:2025
  • Design/upgrade 50–5,000 m³/day
  • Full O&M package
02

Circular chemicals

PAC, recycled FeCl2/FeCl3, NaOH, Javen, H2O2, HCl. Closed-loop cycle: recover the customer’s spent acid → recycle → sell back clean FeCl2/FeCl3. Full COA/MSDS, 24–48h delivery.

  • Batch-consistent quality with COA
  • Jar test before locking the formula
  • Delivery in 24–48h in southern Vietnam
03

Recycling & EPR

Recycling over landfill. Digital hazardous waste manifest traceable to the final recycler – FDI audit-ready. EPR registration per Decree 110/2026/ND-CP (effective 25 May 2026).

  • Spent acid, corrosive solutions, metal sludge
  • Traceable digital manifest for ZWTL
  • Full EPR: declaration – fee – reporting

FREE · ONLY 30 SLOTS THIS YEAR

Register a free WWTP health check per QCVN 40:2025

BioGreenTech engineers visit your site, analyse 15 parameters per QCVN 40:2025 at a VILAS-certified lab, run jar tests and deliver a report within 5 business days – completely free.

  • Pass/fail assessment against QCVN 40:2025 columns A/B
  • 15 parameters tested at a VILAS-certified lab
  • Jar test recommending the optimal chemical formula
  • 25–35 page PDF report + presentation deck
Register now – [24]/30 slots left

No obligation to purchase follow-on services. NDA-protected.

Register Free WWTP Health Check

ZWTL · Zero Waste to Landfill

Circular environmental cycle

A closed-loop process from the customer factory to the final recycler.

01

WWTP operation

BioGreenTech engineers operate your system 24/7, keeping effluent within QCVN 40:2025 columns A/B.

02

Optimal chemical supply

After jar testing we deliver the right type, dose and time. No waste – no dead stock.

03

Recover spent acid & metal sludge

Your hazardous waste doesn’t go to landfill – we transport it to our recycling plant in Toc Tien IZ with a digital manifest.

04

Recycle into clean FeCl2/FeCl3

Convert spent acid and sludge into clean coagulant sold back to the steel/water treatment industries – a closed loop.

Need the full 100+ SKU catalogue?

hoachatlocthien.com is our partner site specialising in chemicals, with a full catalogue of 100+ SKUs.

Visit hoachatlocthien.com →

Featured projects

Featured projects

Project figures are representative examples; client identities are published only with approval.

Trusted by textile, food, plating, steel and electronics plants across Vietnam

Client logos — pending usage permission
Client logos — pending usage permission
Client logos — pending usage permission
Client logos — pending usage permission
Client logos — pending usage permission

Latest news

News & environmental regulation

Talk to BioGreenTech’s engineering team

Reply within 24 business hours. A responsible engineer will call back to clarify your system status.

Free Consultation Request

Our engineering team will respond within 24 business hours.

The form is under maintenance, please call our hotline: 0969 244 444

We commit to data privacy and no spam.

Công Ty TNHH Biogreen Tech Vina

  • Hotline: 0969 244 444
  • Email: info@biogreentech.vn
  • Address: No. 4 Northeast Ring Road 1, Dong An Quarter, Tan Dong Hiep Ward, HCMC, Vietnam
  • Tax ID: 3703240466
  • Working hours: Mon–Sat: 08:00–17:30 · 24/7 hotline for O&M clients
Image: head-office location map