Environmental registration for Group IV projects

Group IV projects under Decree 08/2022/ND-CP do not need an environmental permit, but must still register with the commune-level People’s Committee where the facility is located.

What we do

  • Confirm the correct project group to avoid filing the wrong dossier type
  • Draft the registration document using the statutory template, describing sources and treatment measures
  • File with the commune-level authority and follow up until confirmation
  • Advise on follow-on duties: logbooks, waste collection contracts, periodic reports

Process

01

Project classification

Match scale, capacity and production type against the Group I–IV criteria.

02

Discharge survey

Record wastewater, emissions, solid and hazardous waste generated and current treatment.

03

Draft the registration

Draft per the statutory form, attaching the site layout and waste collection contracts.

04

File & archive

File with the commune-level authority and archive the confirmation in the plant’s environmental records.

Who needs this service

Small manufacturing facilities and workshops in Group IV
Service businesses generating waste at small scale
Newly established companies completing minimum environmental procedures

Frequently asked questions

Is there a state fee for registration?

Registration does not carry the appraisal fee that applies to permits. Costs are mainly dossier preparation and monitoring (if needed) to describe discharge sources.

Are periodic reports still required after registration?

Yes. Facilities must still manage waste, keep records and submit environmental protection reports as required for their category.

What if we register under the wrong group?

If the facility actually belongs to a group requiring a permit but only registered, it is treated as operating without a permit and may be fined under Decree 45/2022/ND-CP. Classification must therefore be done carefully up front.